Westec’s Streamlined Tool Transfer Process
Westec Plastics Corporation has developed a thorough process for domestic and offshore tooling transfers to keep production on track and maintain part quality.
Incoming Inspection and Documentation Audit
When a tool arrives at our USA injection molding facility, we perform a detailed inspection to verify cavity dimensions against the original print, examining wear points and ejector pins.
First Article Inspection
First article inspection completes the transfer process by confirming that the molded parts meet print requirements before production moves forward. This step includes a full product dimensional layout and material certifications to ensure that the transferred tool can support consistent part quality.
Steel Certification and Maintenance Standards
Tool transfers do not always arrive with complete documentation. Steel type is important because a P20 mold base responds differently to repeated cycling than an H13 or S7 cavity insert, and using the wrong maintenance interval for the steel specification can shorten tool life.